A-Frame & Specifications
Wall:
40mm PIR sandwich panel
Roller Door:
2 No. 4.86m x 5.5m electric galvanised
Pedestrian Door:
2m x 1m MOE door
After many years of working outdoors to carry out work on vehicles, Tommy’s Removals took the step to look at what options they had into a building that would enable work to be carried out.
The unit WS Temporary Buildings provided was ideal to use as a two bay workshop. The client installed a pit into one bay, but the height of the building means works carried be carried out on jacks on the other.