Malcolm Group - Grangemouth

A-Frame & Specifications

Span:

2 No 15.00 metres

Length:

50.00 & 60.00 metres

Eave Height:

6.20 metres

Ridge Height:

8.69 metres

Roof:

Thermo Insulated

Wall:

Steel sheet walling

Roller Door:

2 x 4.86m x 5.5m speed door units

Pedestrian Door:

2m x 1m MOE door

Flooring:

Heating:

Challenge: The Malcolm Group required additional covered storage space for steel IBC’s at their site in Grangemouth.

Solution: WS Temporary Buildings provided a tailored solution by installing 2 linked 15m units, creating a total area of 1650m². Utilising the available mixed concrete and tarmac area, the industrial steel buildings were swiftly installed within 1 week, seamlessly integrating into the client’s operations.

Key Features:

  • Flexible Options: Our approach allows for customization with features like roller shutter doors, Non-insulated or Insulated units, electrical fit outs, and lighting, catering to diverse storage needs.
  • Rapid Installation: Regardless of size or specific requirements, our experienced team ensures swift on-site installation within days of order placement.

Result: The newly installed steel buildings now serve as a valuable asset, optimising storage capacity and enhancing operational efficiency for The Malcolm Group.

Request a Callback
Request a Callback

 ©2023 WS Transportation Limited.  All Rights Reserved.

Request a Quote