Solution: WS Temporary Buildings provided Malcolm Group with a tailored solution by installing 2 linked 15m units, creating a total area of 1650m². Utilising the available mixed concrete and tarmac area, the industrial steel buildings were swiftly installed within 1 week, seamlessly integrating into the client’s operations.
Key Features:
Result: The newly installed steel buildings now serve as a valuable asset, optimising storage capacity and enhancing operational efficiency for The Malcolm Group.