Wiltshire Council

As the height of the initial coronavirus pandemic came upon us, we were contacted by Wiltshire Council to supply temperature-controlled units to be installed at two hospital sites.

Wall & Floors

Walls & Floors had been struggling to load pallets of tiles in the dry and did not want to have another winter where the cardboard packaging was damaged by the weather.

Tommy’s removals

After many years of working outdoors to carry out work on vehicles, Tommy’s Removals took the step to look at what options they had into a building that would enable work to be carried out.

TIP Tankers

Although TIP Tankers already have workspace for carrying out maintenance the additional covered are has increased the capacity to work on Tanker units.

S Cooper & Sons Ltd

Long established haulage company S Coopers & Son Ltd based in Winsford had an existing concrete are which had the potential for loading but always left the goods exposed to the elements.

P & K Shutters

After a devastating fire saw the workshop of P & K Shutters burnt to the ground, they needed to limit the impact and get themselves back up and running as soon as possible.

Morrisons Plc

With COVID 19 staying around the need for Morrisons to create areas that were social distanced on a more permanent basis had become apparent.

Northern Power Tools

Northern Power Tools needed additional storage & workshop space which had to be connected to the existing building.

WS Tanker (Buildings 2&3)

With the success of the 10m x 15m unit we have had in place for a workshop, the need for two additional units, a wash bay and dry storage became a requirement.

Malcolm Group

The Malcolm Group needed additional covered storage space for steel IBC’s at there site in Grangemouth.

Request a Quote