Staffordshire Fire Doors
Staffordshire fire door needed storage / work area where finished products would be held prior to dispatch.
Northern Power Tools
Northern Power Tools required additional storage and workshop space, seamlessly connected to their existing building.
WS Tanker (Buildings 2&3)
With the success of our 10m x 15m temporary storage building, utilised as a workshop, the demand for two additional units arose. These units were required for a wash bay and dry storage purposes.
Malcolm Group
Challenge: The Malcolm Group required additional covered storage space for steel IBC’s at their site in Grangemouth.
Ham Baker Site (DMI Group)
Having an area in the heart of Stoke on Trent Ham Baker wanted to utilise it for additional storage.
Explore
Explore were in need of covered storage areas which did not need to be fully enclosed.