Morrisons Plc

With COVID 19 staying around the need for Morrisons to create areas that were social distanced on a more permanent basis had become apparent.

Northern Power Tools

Northern Power Tools required additional storage and workshop space, seamlessly connected to their existing building.

WS Tanker (Buildings 2&3)

With the success of our 10m x 15m temporary storage building, utilised as a workshop, the demand for two additional units arose. These units were required for a wash bay and dry storage purposes.

Malcolm Group

Challenge: The Malcolm Group required additional covered storage space for steel IBC’s at their site in Grangemouth.

IFOR WILLIAMS TRAILERS

IWT had plenty of yard space and required internal storage for goods to protect against the elements.

Graylaw

Graylaw Freights operation had been running their operation from several buildings which although had works needed to be streamlined.

Explore

Explore were in need of covered storage areas which did not need to be fully enclosed.

Eddie Stobart

Centrally based in Crick, Northamptonshire, Eddie Stobart required a cross dock facility in which goods are kept in the condition their clients would expect.

Carriers

A simple but effective requirement. WS Temporary buildings rented this 10m unit to Carriers so they can carry out work on the heating & ventilation units without the risk of water entering critical areas This is just to help them over a busy period.

Request a Quote