WS Temporary Buildings provided an insulated temporary workshop specific to their needs. The 10m span unit was supplied within 10 days of order and installed over a 2-day period. We worked with the client to ensure minimal disruption to the site during the build process. The building is installed onto the client existing concrete using chemical anchors.
©2023 WS Transportation Limited. All Rights Reserved.